Projects

dRay Mission Critical’s span of data center projects over the last three decades has been concentrated in North America.  These include projects both in the U.S. and Canada.

Completed Projects

Medical

New Data Processing Facilities (12,000 sqft)

Designed and constructed new data center facilities in an existing four story building which entailed demolition, concrete, masonry generator enclosure, new walls, acoustical ceiling, raised access flooring, resilient flooring, doors/frames/hardware, painting, air conditioning ductwork, “dx” piping, eight computer room a/c units, UPS system, three power distribution units, generator set, automatic transfer switch, new main electrical service, fire suppression system, pre-action sprinkler system, water detection, site monitoring and electrical.

Museum

New Data Center (3,000 sqft)

Design consultation and construction of new data center for this major museum, including doors/frames/hardware, walls, acoustical ceiling, painting, raised flooring, dual power distribution & UPS systems, surge suppression, monitoring system, water detection, pre-action sprinklers, exhaust system, redundant air conditioning system, chilled water system and electrical.

Telecom

New Telecom Switching Center (13,000 sqft)

Constructed new telecom switching center in existing six story building which entailed demolition, concrete, masonry generator enclosure, structural steel, new walls, acoustical ceiling, raised access flooring, resilient flooring, window tinting, doors/frames/hardware, painting, air conditioning ductwork, condenser water piping, cooling towers, twelve computer room a/c units, three UPS units, one –48 volt DC UPS system, cable tray system, generator set, automatic transfer switch, new main electrical service, fire suppression system, pre-action sprinkler system, water detection and electrical work.

Music Industry

Expand Existing Data Processing Facility (2,500 sqft)

Designed and constructed expansion of existing data processing facility in an existing five story building which entailed demolition, new walls, acoustical ceiling, raised access flooring, resilient flooring, doors/frames/hardware, painting, air conditioning ductwork for entire space, “dx” piping, three computer room a/c units, UPS system, one power distribution unit, new main electrical service, fire suppression system, pre-action sprinkler system, water detection, site monitoring and electrical work.

Pharmaceutical Distribution

Emergency Generator & UPS Systems for Regional Distribution Facilities

Installed new emergency generator & UPS systems for regional distribution warehouses included concrete pads, power distribution, UPS, emergency generator sets and electrical.

Regional Distribution Facility (50,000 sqft)

Designed and constructed a new regional distribution warehouse including a computer room with new walls, new acoustical ceiling, raised flooring, resilient flooring, carpeting, doors/frames/hardware, painting, cabinetry, two rooftop package air conditioning units, ductwork, air distribution, plumbing, fire sprinklers, UPS equipment, power distribution, generator set and miscellaneous electrical.

Fuel Distribution

New Data Center (4,500 sqft)

Designed and constructed new data center facilities on the sixth floor of an existing sixteen story building which entailed installing new walls, acoustical ceiling, raised flooring, resilient flooring, cove base, painting, doors/frames/hardware, air conditioning ductwork, chilled water piping, air cooled chillers, computer room a/c units, UPS equipment, power distribution unit, fire suppression system, pre-action sprinkler system, automatic transfer switch, relocated generator set, fuel system and electrical work.

Banking

Expansion/Modification of Transaction Services Center (40,000 sqft)

Expanded and modified existing transaction services center inside an existing office building which entailed a new concrete block generator and water tank enclosure, new building entrance, new walls, new acoustical ceiling, raised flooring, static dissipative flooring, doors/frames/hardware, painting, cabinetry, cooling tower, air conditioning ductwork, fourteen computer room a/c units, condenser water piping, plumbing, water storage tank, pre-action sprinklers, fire suppression, four power distribution units, two UPS Systems, one generator set, four new automatic transfer switches, distribution panels and electrical work.

Higher Education

Remodel Computer Room (2,000 sqft)

Design consultation and construction to upgrade existing data processing facilities for this major university. Project included replacement of entire raised flooring system, air conditioning units, power distribution units, new UPS equipment and a new emergency generator system, all while maintaining ongoing operations in the facility.

Entertainment

New Corporate Data Center (15,000 sqft)

Designed and constructed new data center facilities inside new five story building which entailed installing new walls, acoustical ceiling, raised flooring, carpeting, resilient flooring, doors/frames/hardware, painting, cabinetry, air conditioning ductwork, condenser water piping, ten computer room a/c units, UPS system, four power distribution units, fire suppression system, pre-action sprinkler system, water detection, site monitoring, closed circuit television, card access system and electrical work.

Cable System

New Head-End Facility (3,000 sq.ft.)

Constructed the cable company’s new head-end facility consisting of a new single story masonry building including site work, roadwork, demolition, concrete, structural steel, roofing, masonry, drywall, acoustical ceiling, raised access flooring, resilient flooring, doors/frames/hardware, painting, ductwork, “dx” piping, three computer room a/c units, UPS system, generator set, automatic transfer switch, new main electrical service, external water tank, plumbing, fire suppression system, water detection, site monitoring and electrical work.

Property Management

New Data Center (3,000 sqft)

Designed and constructed new data center facilities in an existing single story building while maintaining operation of the existing data center during construction. This entailed demolition, concrete, new walls, acoustical ceiling, raised access flooring, resilient flooring, doors/frames/hardware, painting, air conditioning ductwork, “dx” piping, four computer room a/c units, four UPS systems, four power distribution units, generator set, automatic transfer switch, new main electrical service, fire suppression system, water detection, site monitoring and electrical work.